1. The basic situation of the construction project
Project Name: Zhejiang Wenxin Electromechanical Manufacturing Co., Ltd. Annual Production of 1 Million Sets of Sprayer Accessories Technical Transformation Project
Project nature: technological transformation
Construction content: The total investment of the project is about 13.89 million yuan. The existing 3# factory building in Wenxin No. 2 Plant is used to produce new sprayer accessories, mainly using processing techniques such as granulation, extrusion, and winding, and the introduction of domestic advanced extrusion After the completion of the project, the production line, winding machine, and other equipment will form an annual production capacity of 1 million sets of sprayer accessories. The sprayer accessories produced are mainly rubber hoses and hoses, all of which are equipped for self-use in a factory.
2. Distribution of main environmentally sensitive targets within the scope of environmental impact assessment
The project is located in Plot C-10-01, Phase III of Shitang, Taizhou Bay Concentration Area, Taizhou City, Zhejiang Province (Wenxin Second Plant).
The distribution of the main environmentally sensitive points within the project evaluation scope is as follows:
Table 1 Distribution of main environmentally sensitive points within the scope of project evaluation
name |
Coordinate/m |
protect Object |
Protect content |
environment Functional area |
Relative site Azimuth (°) |
Relative distance/m |
|||
X |
AND |
Factory boundary |
Technological Transformation workshop |
||||||
atmosphere environment |
Yuehai City (Under construction) |
356262 |
3164843 |
live |
GB3095-2012 Secondary standard |
Class II area |
SE (124) |
490 |
500 |
Acoustic environment |
No sensitive protection targets within 50m |
||||||||
Surface water |
Jiutiaohe |
- |
- |
river/ Small river |
GB3838-2002 Type IV standard |
Agriculture, industry Water area |
In (270) |
370 |
280 |
groundwater |
The project construction site does not involve sensitive areas such as the quasi-protection area of the domestic water supply source, the recharge runoff area outside the quasi-protection area of the domestic water supply source, and other protection areas related to the groundwater environment |
||||||||
Ecology environment |
The current ecological structure of the project site is mainly based on the artificial ecosystem based on the industrial zone. Ecologically sensitive areas such as natural reserves, forest parks, scenic spots, etc. |
3. Forecast of major environmental impacts
(1) Exhaust gas
According to engineering analysis, the project's waste gas is mainly feed dust, pelletizing, and extrusion waste gas.
After the process waste gas of the project is processed, the emission of waste gas-related pollutants such as ingredients, pelletizing, and extrusion can meet the relevant limit requirements in the "Comprehensive Emission Standard of Air Pollutants (GB16297-1996).
(2) Wastewater
According to the aforementioned analysis, the project wastewater is mainly domestic sewage.
Domestic sewage is pre-treated in septic tanks reaches the standard, and then connected to the surrounding municipal sewage pipe network and sent to Taizhou Water Treatment Development Co., Ltd. for treatment. The project wastewater has little impact on the surrounding water environment.
(3) Noise
The noise source during the operation of this project is mainly equipment operation noise. After implementing the sound insulation and vibration reduction measures and distance attenuation recommended in this environmental assessment, the noise at the factory boundary can meet the requirements of the 3rd and 4th acoustic environment in the "Environmental Noise Emission Standard for Industrial Enterprises" (GB12348-2008). After the operation of the project, the noise will have little impact on the surrounding acoustic environment.
(4) Solid waste
According to the foregoing analysis, the waste generated by this project includes plastic scraps, waste hydraulic oil, waste raw material barrels, waste packaging materials, and domestic garbage.
For the general industrial solid waste management requirements of this project, the construction unit shall comply with the "General Industrial Solid Waste Storage and Landfill Pollution Control Standard" (GB18599-2020). General solid waste shall not be stacked in the open, and the storage point shall be protected from rain and seepage.
For hazardous solid wastes such as waste lubricating oil, classified collection and temporary storage shall be carried out by the requirements of "Hazardous Waste Storage Pollution Control Standards" (GB18597-2001) and "Guidelines for Environmental Impact Assessment of Hazardous Wastes of Construction Projects", and set up dedicated hazardous waste storage Places and storage floors must be hardened and treated with anti-corrosion and anti-seepage treatment. Collect and temporarily store hazardous solid waste, and then send it to a qualified unit for processing. Hazardous wastes of the project shall not be scattered randomly and shall be properly stored to prevent secondary pollution caused by sun, rain, and leakage. The transfer and disposal of hazardous wastes shall be handled by the relevant provisions of the "Administrative Measures for the Exchange and Transfer of Hazardous Wastes of Zhejiang Province". Transfer approval procedures. At the same time, for the collection and management of hazardous wastes, full-time management personnel are required, and enterprises should establish a standardized accounting system.
The types of solid waste generated after the operation of this project are clear and can be treated in a timely and reasonable manner without significant impact on the surrounding environment.
4. The main environmental protection measures to be taken, environmental risk prevention measures and expected results
The main environmental protection measures adopted by the project and their expected effects are shown in Table 2 below.
Table 2 Main environmental protection measures adopted by the project and expected effects
content Element |
Discharge port (number, Name)/pollution source |
Pollutant Project |
Environmental protection measures |
Executive standard |
Atmospheric Environment |
DA001 (Feeding dust) |
particulates |
After centralized collection at each station, it is processed by the bag filter and then discharged through the exhaust cylinder (1#). |
GB16297-1996 |
DA002 (Exhaust gas from pelletizing and extrusion) |
Non-methane total hydrocarbons, vinyl chloride, hydrogen chloride, DOTP, odor concentration |
After centralized collection at each station, it is treated by electrostatic degreasing + photocatalytic oxidation + activated carbon and then discharged through the exhaust cylinder (2#). |
GB16297-1996 |
|
3# outside the workshop |
Non-methane total hydrocarbons |
Strengthen workshop ventilation |
GB37822-2019 |
|
Factory boundary |
Particulate matter, non-methane total hydrocarbons, vinyl chloride, hydrogen chloride, DOTP |
Strengthen workshop ventilation |
GB16297-1996 |
|
Odor concentration |
Strengthen workshop ventilation |
GB14554-93 |
||
Surface water environment |
DW001 (domestic sewage) |
pH, CODCr, NH3-N, SS, etc. |
After pretreatment in septic tanks, grease traps, etc., the pipes are discharged |
GB8978-1996 |
Acoustic environment |
Around the factory boundary (Equipment such as granulator) |
Leq (A) |
Use low-noise equipment, vibration reduction, car interval sound, etc. |
GB12348-2008 |
Electromagnetic radiation |
/ |
/ |
/ |
/ |
Solid Waste |
General solid waste |
Bag dust collection, waste packaging materials |
Classified collection, reasonable storage, and centralized external sales to material companies |
Requirements of the Industrial Solid Waste Management Clause in the Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste |
Domestic garbage |
Entrust the sanitation department to deal with |
"Regulations on the Management of Domestic Waste in Zhejiang Province" |
||
Hazardous Waste |
Waste hydraulic oil, waste activated carbon, waste DOTP oil, waste raw material barrel |
Separate collection, reasonable storage, and entrust a qualified unit for disposal |
GB18597-2001 and its amendments |
|
Soil and groundwater Pollution prevention measures |
According to relevant industry standards and anti-seepage technical specifications, the enterprise plant area is divided into three anti-seepage zones: key anti-seepage area (temporary storage room for hazardous waste), general anti-seepage area (production area) and simple anti-seepage area (other areas) |
|||
Ecological protection measures |
/ |
|||
Environmental risk Precautions |
Strictly implement relevant laws and regulations for operations; strengthen risk prevention during transportation, storage, and production |
|||
Another environment Management requirements |
/ |
5. Preliminary conclusions of environmental impact assessment
After the various pollutants produced by the project are treated by corresponding measures, the impact on the surrounding environment is within the tolerable range, and the environmental risk is within the acceptable level. This project complies with the principles of environmental protection approval.
Six, contact information
1. Construction unit: Zhejiang Wenxin Electromechanical Manufacturing Co., Ltd.
Contact: Du Juan
Contact: 18906593516
Contact address: Plot C-10-01, Phase III of Shitang, Taizhou Bay Concentration District, Taizhou City, Zhejiang Province (Wenxin Second Factory).
Post Code: 318000
2. Environmental assessment unit: Zhejiang Industrial Environmental Design and Research Institute Co., Ltd.
Contact: Lin Gong
Contact: 0576-81810385
Contact address: No. 618, West Section of Shifu Avenue, Taizhou City, Zip Code: 318000
3. Local environmental protection department: Taizhou Bay New District Bureau of Taizhou Ecological Environment Bureau
Unit Address: No. 9 East Section of Jianan Avenue, Taizhou City, Zhejiang Province
Contact number: 0576-88909056
Zhejiang Wenxin Electromechanical Manufacturing Co., Ltd.
November 9, 2021